Step-by-Step Geothermal Installation
-
1
Start with a bare lot.
-
2
Drill boreholes.
-
3
Dig the header trench.
-
4
Supply/return pipe, outside and in.
-
5
Heat pump, tanks and plumbing.
-
6
Install forced air ductwork.
-
7
Finished.
Copyright © 2008 Threshold Energies Corporation. All Rights Reserved.